Along the Harbor Walk, looking at the South Postal Annex at South Station. The tall white building in the background is the Federal Reserve Bank of Boston.
The Longfellow Bridge, connecting Boston to Cambridge, is undergoing repairs and is expected to be completed by December 2018, two years behind schedule.